I continued to work on fuselage parts today. I had previously made a number of the parts for the rear spar carry through. Today I finished all of the drilling of these parts. I was short the AN3 hardware needed to bolt the pieces together so I need to order these from Aircraft Spruce.
You must be logged in to post a comment.