I finished making the remaining wire support brackets and riveted them to the ribs. I used my pneumatic angle drill to drill the holes through ribs. Once all of the brackets were mounted I pulled the eight wires required for the lights, through the wing lightening holes. I used twelve feet of wire for each. Once all of the wires were pulled I began installing the adel clamps to hole the wire bundle in place. Between each clamp I tied the bundle using wire lace.